SIDDHA WATERFRONT - BLOCK 3C (LOTUS) by Siddha Group. 2 BHK, 3 BHK in Rahara, Kolkata. ₹38 Lakhs Onwards. Under Construction. RERA:…
SIDDHA WATERFRONT - BLOCK 3C (LOTUS) by Siddha Group. 2 BHK, 3 BHK in Rahara, Kolkata. ₹38 Lakhs Onwards. Under Construction. RERA:…
Nestled in the Rahara locality, at Chowdhury More, Old Calcutta Road, Patulia, Barrackpore, Kolkata, SIDDHA WATERFRONT - BLOCK 3C (LOTUS) offers residential apartments. Developed by Siddha Group, this under-construction project features a single tower comprising 103 units. Prospective residents can select from 2 BHK and 3 BHK configurations, with area ranges spanning from 518 to 828 sqft. Prices for these homes begin at ₹38 Lakhs. The development includes a natural lake, a swimming pool, and a gymnasium. Recreational facilities extend to a kids' play area, a cricket pitch, a pet park, and a cycling track, alongside an amphitheatre. Essential services such as power backup, fire sprinklers, 24X7 water supply, and an intercom system are provided. The project also incorporates a sewage treatment plant and utilizes renewable energy. SIDDHA WATERFRONT - BLOCK 3C (LOTUS) is registered under RERA with the number WBRERA/P/NOR/2023/000535, with possession slated for December 31, 2028. This development positions itself as a residential offering within the Barrackpore area of Kolkata.
Rahara, Kolkata · Sub-locality: Chowdhury More, Old Calcutta Road, Patulia, Barrackpore · State: West Bengal · PIN Code: 700119
Type: Apartment · Status: Under Construction · Total Units: 103 · Total Towers: 1 · Total Floors: 14 · Highlights: Natural Lake, Swimming Pool, Gymnasium, Kids Play Area, Cricket Pitch, Pet Park, Cycling Track, Amphitheatre, Power Backup, Fire Sprinklers, 24X7 Water Supply, Sewage Treatment Plant, Intercom, User of Renewable Energy.
Configurations: 2 BHK, 3 BHK · Carpet Area: 518 – 828 sqft · Price Range: ₹38 Lakhs Onwards
RERA Approved ✓ · RERA Registration: WBRERA/P/NOR/2023/000535
Developer: Siddha Group · Website: https://www.siddhagroup.com/
Expected Possession: 2028-12-31 · Launch Date: 2023-09-13 · Current Status: Under Construction
Natural Lake, Swimming Pool, Gymnasium, Kids Play Area, Cricket Pitch, Pet Park, Cycling Track, Amphitheatre, Power Backup, Fire Sprinklers, 24X7 Water Supply, Sewage Treatment Plant, Intercom, User of Renewable Energy