SAYAN GALAXY APARTMENT by ALI CONSTRUCTION. 2 BHK, 3 BHK in Ghasiara, Kolkata. ₹Est: ₹30.0 L — ₹75.0 L. Under Construction. RERA: WBRERA/P/SOU/2025/002887.…
SAYAN GALAXY APARTMENT by ALI CONSTRUCTION. 2 BHK, 3 BHK in Ghasiara, Kolkata. ₹Est: ₹30.0 L — ₹75.0 L. Under Construction. RERA: WBRERA/P/SOU/2025/002887.…
In the evolving landscape of Sonarpur, Ghasiara, Kolkata, a new residential and commercial opportunity emerges with SAYAN GALAXY APARTMENT. Developed by ALI CONSTRUCTION, this mixed-use project offers a blend of living and retail spaces in a prominent locality. With its strategic address in Ghasiara, PIN 700150, SAYAN GALAXY APARTMENT is poised to cater to diverse needs. The project features a total of 24 units, presenting configurations of 2 BHK and 3 BHK, with an estimated price range of ₹30.0 L to ₹75.0 L. Currently under construction, possession is scheduled for December 31, 2027. This development is registered under RERA with the number WBRERA/P/SOU/2025/002887, ensuring regulatory compliance. Residents and occupants will benefit from a selection of practical amenities. These include an adequate capacity elevator, necessary fire equipment as per law, and a common letterbox area for all units. Drinking water facilities will be supplied by the Rajpur Sonarpur Municipality. The project also incorporates an aesthetically designed entrance and lobby for emergency access and egress, complemented by necessary power back-up. SAYAN GALAXY APARTMENT is designed to provide a functional and compliant living and commercial environment.
Ghasiara, Kolkata · Sub-locality: Sonarpur · State: West Bengal · PIN Code: 700150
Type: Mixed · Mixed Use · Status: Under Construction · Total Units: 24 · Highlights: RERA Approved; 2/3 BHK Configurations; 24 Units; Possession by Dec 2027; Under Construction; Located in Sonarpur, Kolkata
Configurations: 2 BHK, 3 BHK · Price Range: ₹Est: ₹30.0 L — ₹75.0 L
RERA Approved ✓ · RERA Registration: WBRERA/P/SOU/2025/002887
Developer: ALI CONSTRUCTION
Expected Possession: 2027-12-31 · Launch Date: 2025-05-29 · Current Status: Under Construction
Adequate capacity elevator (lift), Necessary fire equipment's as per law, Letter box in one common place for each unit, Drinking water facilities as supplied by Rajpur Sonarpur Municipality, Aesthetically designed entrance and lobby for emergency entry and exit, Necessary power back-up will be provided