RIVER COUNTY by Aralias Infratech. Residential Plots in Radhajote Rangapani, Siliguri. ₹Est: ₹22.0 L — ₹55.0 L. Under Construction. RERA:…
RIVER COUNTY by Aralias Infratech. Residential Plots in Radhajote Rangapani, Siliguri. ₹Est: ₹22.0 L — ₹55.0 L. Under Construction. RERA:…
In Radhajote, Rangapani, Siliguri, Aralias Infratech unveils RIVER COUNTY, a residential plot development designed for those seeking to build their custom homes. This under-construction project, identified by RERA WBRERA/P/DAR/2024/001422, offers a selection of residential plots within a secure environment. RIVER COUNTY comprises 150 total units, providing various plot sizes to accommodate different preferences. The estimated price range for these plots is ₹22.0 L to ₹55.0 L, catering to a spectrum of investment considerations. Residents will benefit from a secure gated community with 24/7 security and comprehensive CCTV surveillance, ensuring peace of mind. The development prioritizes a well-maintained living space, featuring paved roads and grass concrete paver sidewalks for easy navigation and pedestrian comfort. Practical amenities include a drinking water facility and robust water supply arrangements. For leisure and community interaction, the project incorporates a dedicated kid's area and grants access to common spaces. An intelligent drip and sprinkler irrigation system further enhances the green areas within the community. Possession for these plots is scheduled for 2026-12-31. RIVER COUNTY positions itself as a foundational opportunity for future homeowners in Radhajote, Rangapani.
Radhajote Rangapani, Siliguri · State: West Bengal · PIN Code: 734433
Type: Plot · Status: Under Construction · Total Units: 150 · Highlights: Secure Gated Community, 24/7 security, paved roads, kid's area, CCTVs, grass concrete paver sidewalks, intelligent drip and sprinkler irrigation system.
Configurations: Residential Plots · Price Range: ₹Est: ₹22.0 L — ₹55.0 L
RERA Approved ✓ · RERA Registration: WBRERA/P/DAR/2024/001422
Developer: Aralias Infratech · Website: https://araliasinfratech.com
Expected Possession: 2026-12-31 · Launch Date: 2024-05-07 · Current Status: Under Construction
Secure Gated Community, 24/7 Security, Paved Roads, Kid's Area, CCTV Surveillance, Grass Concrete Paver Sidewalks, Intelligent Drip and Sprinkler Irrigation System, Drinking Water Facility, Access to Common Spaces, Water Supply Arrangements