Legal Guide

Flat Possession Checklist — 12 Things to Inspect Before You Sign

PropyMart · 2026

Possession Day — Get It Right

Taking possession is your last opportunity to raise construction defects before you sign off. Builders are legally obligated under RERA to fix snag-list items for 5 years post-possession.

Structural Checks (Exterior)

Inspect: cracks in walls/columns (hair-line vs. structural), waterproofing on terrace and bathrooms, window alignment and sealing, drainage slopes on balconies, and lift functionality.

Internal Finishes

Check: floor tile levels and grout quality, paint finish (no brush marks or peeling), door and window operation, hardware quality, and whether all fixtures match the sale agreement's specification sheet.

Electrical & Plumbing

Test all power points, switches, and lights. Run all taps and check water pressure. Flush all toilets. Inspect under-sink plumbing for leaks. Confirm that MCB ratings match the sanctioned load.

Document Checklist

Collect: occupation certificate (OC), completion certificate (CC), no-dues certificate, allotment letter, agreement copy, chain of title documents, and NOC from society (if formed).

Use PropyMart Snagging Tool

PropyMart users can upload flat inspection photos, auto-generate a snag list with categories, and share it directly with the builder's site team. Available free for all PropyMart registered buyers.

Explore More on PropyMart

India's most comprehensive real estate & interior platform. Free tools, verified listings, and AI property insights.

Browse Free Tools →